The short answer
A straightforward compliant inspection through the current pilot starts with the provider's advertised A$200 all-inclusive price. If the inspector issues Form 23, Greater Bendigo currently charges A$23.90 to lodge it. That makes A$223.90 before repairs, reinspection or anything outside the written quote.
No referral fee applies during the first 10 qualified new-owner requests. Terms after that free pilot are not yet agreed and will be disclosed before any later charge applies.
A$223.90 is a starting calculation, not a guaranteed final bill. The Building and Plumbing Commission says there is no set inspection fee and that barriers needing more than one inspection will likely cost more.
Ask what the A$200 includes
The pilot provider calls its current A$200 price all-inclusive and includes inspection and certification in its public service description. Before booking, ask for these items in writing:
- The first site visit. Confirm the property is inside the quoted service area.
- Form 23 when the barrier complies. Ask whether certification is included in the A$200.
- GST and travel. Check that neither will be added later.
- Reinspection. Ask what another visit costs if the barrier needs work.
Why the final cost can rise
If the barrier does not comply, the inspector may give written directions and return to inspect it again. Repair work is separate from the inspection. The BPC recommends getting quotes from at least two authorised practitioners and comparing the scope, not only the first-visit number.
A Victorian pool barrier inspection can be carried out by an authorised Building Surveyor BS-U/BS-L, Building Inspector IN-U/IN-L, or Pool Safety Inspector (IN-PS). Check the current registration and any limits before paying.
What the A$23.90 pays for
The A$23.90 is the City of Greater Bendigo's current compliance certificate lodgement fee. It is paid to the City after Form 23 is issued. It is not the inspection fee and it does not cover repairs. The City says Form 23 must be lodged within 30 days of issue.
Use the council letter before requesting a quote
Keep the letter nearby. Use its property details, applicable barrier standard and certificate due date. Pool Letter Help accepts Greater Bendigo requests due today or within 60 days and does not ask you to upload the letter.